Amount
CO 2
Item Energy conservation Energy conserved reduced CO 2 reduced (ton)
Factory measures conserved (ton)
TF1 wastewater treatment Electricity
aeration machine operation (KWH) 4,745 2,510
time adjustment
Replaced indoor fire alarm light Electricity
with LED (KWH) 1,482 0.78
Taichung
Factory Turn-off buffering time reduction
plan for the dehumidifiers in the Electricity 1,320 0.70
lamination cleanroom (KWH)
Discontinue the use of TF-1 W/
H VFD to reduce the unloaded Electricity
iron losses, and use the (KWH) 45,806 24.23
supporting power lines to supply
the original load from S/B
Not heating SFR seam sewing
machine (hot–melt adhesive is Electricity 57,481 30.3
replaced by twin adhesive) (KWH)
Lukang
Factory
Improved the power supply and
output circuit of the weaving
machine's yarn breakage Electricity 56,074 29.6
device and reduce the electricity (KWH)
consumption
Replaced the air conditioners
Changpin in the 2nd laminated glass Electricity 407,778 215.3
Factory assembly room with energy- (KWH)
saving products 1