Page 91 - 2016 TGI CSR 電子書
P. 91
Total Air Pollutants Emissions for Each TGI Factory
Units:Ton
Year
Air pollution 2014 2015 2016
evaluation item
NOx 1,080,399 1,032,223 1,162,249
SOx 441,065 449,483 515,915
VOCs 174,439 175,223 185,586
Particulate matter 39,875 36,081 41,712
Water Pollution Prevention
When it comes to water pollution prevention, TGI’s top priority is to reduce the production waste
going into wastewater. All factories have wastewater treatment equipment to reduce the pollutants
in the wastewater so that the wastewater can meet the local discharge quality standards. Graywater,
after being treated by the treatment system, is in compliance with the legal standard to be discharged
to the surface water body. The Taoyuan Factory, to reduce wastewater, has recycled part of the
wastewater from production to the wastewater system. In 2016, TGI factories discharged a total of
1,086,336 tons of wastewater, 1.55% less than 2015.
Wastewater Discharge Destination
Factory Discharge Destination
Taoyuan Factory Guanyin Industrial Park Service Center
In compliance with legal quality standard to be discharged to surface water
Hsinchu Factory
body
Taichung Factory Taichung Harbor Special District Water Recycle Center (The Taichung
(including the processing plant has an UF wastewater recycle system, which is estimated to 89
processing plant) recycle 21,000 tons of wastewater for production every month).