Page 57 - 2016 TGI CSR 電子書
P. 57

Review and Recommendations:

                  1. The above chart showed there is no C-class manufacturer, which meets TGI’s requirements.
                  2. Manufacturers are required to provide high quality material only and do so punctually. They
                    are also to provide the lowest prices possible.

                  Details:
                   1.Evaluation Schedule:
                     1-1  Annual  evaluations  are  conducted  at the  end  of every December  and  are  completed  by the 20th  of the
                        following month. 115 Environmental Subcontractor Qualifications and Evaluations Every year Taiwan Glass
                        uses 1-PO-B05-12  (environmental subcontractor evaluation form) to evaluate these subcontractors. During
                        the evaluation cycles, if a subcontractor commits a severe violation of any environmental, labor safety and
                        health regulations, it will be reported to the chairman or president and the said contractor will be disqualified
                        as a TG contractor. Based on TG’s requirements, subcontractors should have necessary licenses/certifications
                        or receive training in order to have smooth cooperation with TG.
                     1-2 Quarterly evaluations are conducted every March, June, September and December and completed before the
                        15th of the following months.
                   2.Class:We categorize our suppliers as A, B and C classes.
                     Class A:Continue cooperation  (≧90 points)
                     Class B:Barely acceptable  (70-89 points)
                     Class C:Terminate  (≦69 points)
                   3.Quality  assurance  units   (and the units  that actually use  the materials)  are responsible  for evaluating  quality
                     items; units that submit purchase requisitions or the material units are responsible for evaluating the delivery;
                     procurement units are responsible for evaluating prices and calculating the total numbers in the surveys.
                   4.Quarterly evaluation results will be preserved by the procurement units for future reference. Annual evaluation
                     results will be submitted to the chairman or president.



               Environmental Sub-contractor Qualifications and Evaluations

                   Every  year Taiwan  Glass uses  1-PO-B05-12 (environmental  subcontractor evaluation  form) to
               evaluate  these subcontractors.  During  the evaluation  cycles,  if a subcontractor commits a severe
               violation of any environmental, labor safety and health regulations, it will be reported to the chairman
               or president and the said contractor will be disqualified as a TG contractor. Based on TG’s requirements,
               subcontractors  should  have  necessary  licenses/certifications  or  receive  training  in  order  to  have
               smooth cooperation with TG.

                   During the initial contract signing, the factory affairs representatives from all factories will head
               to the environmental subcontractors’facilities to understand how they operate and their working
               environments. The representatives will verify their licenses and ensure that the waste collecting and
               disposal process is intact and sign the 3-way contract afterwards.
















                                                                                                                   55

                    Changpin Factory – Scrap glass   Changpin Factory – Scrap glass   Environmental sub – contractor
                      disposal company license     collecting company license        evaluation form
   52   53   54   55   56   57   58   59   60   61   62